top of page

Airfield Lighting Designers

AGL designs can be performed for all military and civilian aerodrome types from regional non-instrument runways to full CAT IIIB hub airport runways. We can provide full AGL designs whether or not a project specification is available, by defining the design criteria. AGL Designs can be provided in one of all of the stages from concept, detailed design, for construction and as-constructed.

All Airfield Lighting designs fully comply to the relevant international and national regulatory bodies such as  ICAO , IEC , EASA , STANAG , ACI , FAA , CAA , CASA , CAAS , CAA NZ GCAA and IAA .

 

Our AGL Design services include:

  • AGL Design and Drawings Review
  • AGL Concept Design
  • Detailed Design
  • AGL Pit and Ducts locations
  • Shop Drawings
  • As-Built Drawings
  • AGL Design Document
  • Final Bill Of Quantities
  • Design Calculations
  • CCR Calculations
  • PAPI Locations
  • Approach Lighting Profile
  • Heliport Lighting Design

AGL DESIGN PROJECT LIST

original?tenant=vbu-digital




Client:          Power Advantage International

Project:        Rehabilitation of Fahud Runway

Location:     Fahud Airport

Service:       AGL Design Calculations

Timeline:    October 2020 - February 2021



original?tenant=vbu-digital





Client:          Waterford Airport

Project:        03-21 Runway Extension

Location:     Waterford Airport

Service:       AGL Concept Design

Timeline:    March - October 2020



original?tenant=vbu-digital




Client:           Perfect Airport Solutions

Project:         APAPI Tengah Airbase

Location:      Tengah Airbase

Service:         APAPI Siting Calculation

Timeline:      August – October 2020



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Brooklyn Engineering Services

Project:         Approach 16 Cable Diversion

Location:      Dublin Airport

Service:         AGL Design Report

Timeline:      January - February 2019



original?tenant=vbu-digital




Client:           Perfect Airport Solutions

Project:         Nadzab Airport Redevelopment

Location:      Lae Nadzab Airport

Service:         AGL Design Layout Drawings

Timeline:      May 2020 – February 2021



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Airways New Zealand

Project:         Flexible Contingent Runway

Location:      Auckland Airport

Service:         AGL Drawing Review

Timeline:      August 2018



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:            Vinci (VCGP)

Project:          Airport Development Plan 2025

Location:       Belgrade Airport

Service:         AGL Concept Design and BOQ

Timeline:       April - August 2018



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Perfect Airport Solutions

Project:         NSC Packages 1 & 2 AGL CMS

Location:      Singapore Changi Airport

Service:         CMS Equipment Drawings

Timeline:      May 2017 – October 2017



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Avionics Limited

Project:         11/29 Runway Circuit Upgrade

Location:      Darwin Airport

Service:         AGL Design Services

Timeline:      May 2017 – October 2017



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Perfect Airport Solutions

Project:         NSC Package 2  (02C-20C)

Location:      Singapore Changi Airport

Service:         AGL Designer

Timeline:      October 2016 - August 2017



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           ADB SAFEGATE

Project:         AGL and NC Backup Runway

Location:      Taiwan Taoyuan Airport

Service:         AGL Design

Timeline:      July - December 2013



original?tenant=vbu-digital





Client:          Waterford Airport

Project:        03-21 AGL Upgrade Works

Location:     Waterford Airport

Service:       AGL Design and Consultant

Timeline:    July 2012 - August 2013



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         Taxiway CL and Stop Bar lighting

Location:      Cork Airport

Service:         AGL Design and Site Supervision

Timeline:      June - December 2012



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         Aerlingus Pier B Accommodation

Location:      Dublin Airport

Service:         Tender Package and Drawings

Timeline:      March - July 2012



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         Remote Parking Floodlighting

Location:      Shannon Airport

Service:         Tender Package and Drawings

Timeline:      January - April 2012



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         17-35 Rehabilitation

Location:      Cork Airport

Service:         AGL Design and Tender Package

Timeline:      January 2012



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         16-34 - CAT I Stop Bars

Location:      Dublin Airport

Service:         AGL Design and Tender Package

Timeline:      December 2011 - July 2012



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         Taxiway A Rehabilitation

Location:      Shannon Airport

Service:         Tender Documents

Timeline:      May - December 2011



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         TBG Removal - AGL and HML

Location:      Dublin Airport

Service:         AGL Design and Supervision

Timeline:      May - October 2011



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         Standby Generator Replacement

Location:      Dublin Airport

Service:         Drawings and Supervision

Timeline:      December 2011 - July 2012



original?tenant=vbu-digital
original?tenant=vbu-digital

Client:           Dublin Airport Authority

Project:         TCL and Stop Bar Upgrades

Location:      Dublin Airport

Service:         AGL Design and Drawings

Timeline:      May - September 2011




bottom of page